Explore chapters and articles related to this topic
An optimal condition based maintenance scheduling for metal structures based on a multidisciplinary research approach
Published in Structure and Infrastructure Engineering, 2019
Jawwad Latif, Zulfiqar A. Khan, Mian H. Nazir, Keith Stokes, Richard Smith
The current work provides algorithmic solution for cost-effective recoating maintenance which is based on a multidisciplinary research approach. Three recoating maintenance strategies are considered such as Patch recoat, Part recoat and Complete recoat. The Patch recoating strategy involves removal of delaminated or rusted area from a specific patch and applying coating on the patch area. The Part recoat involves the surface preparation and recoating of the Part/component. The complete recoating involves preparation of the surface of all the defected areas and applies new coating including anti-rust, primers and top coat.