Explore chapters and articles related to this topic
Engineering of Process-Centric Application Systems
Published in Vivek Kale, Enterprise Process Management Systems, 2018
In 2002, SAP Exchange Infrastructure (SAP XI) was launched as part of the SAP NetWeaver suite. SAP XI version 1.0 evolved into SAP XI 2.0 and SAP XI 3.0 in 2004. SAP XI was built on top of a dual-stack architecture, which includes SAP NetWeaver Application Server ABAP (SAP NetWeaver AS ABAP) and SAP NetWeaver Application Server Java (SAP NetWeaver AS Java). After a few improvements and new features, the product was renamed from SAP XI to SAP NetWeaver PI in 2005. In 2010, SAP PI 7.3 was released with a more productively equipped Java stack: AEX. This is a robust Java-only ESB.
Variations in Costs by Occupation Group
Published in Capers Jones, A Guide to Selecting Software Measures and Metrics, 2017
Over and above the basic compensation levels are shown in Table 13.1, a number of specialized occupations are now offering even higher compensation levels than those illustrated. For example, programmers who are familiar with SAP R/3 integrated system and the ABAP programming language can expect compensation levels about 10% higher than average, and may even receive a signing bonus similar to those offered to professional athletes. This is also true for some big data experts and for cyber-security experts.
Using vendor management inventory system for goods inventory management in IoT manufacturing
Published in Enterprise Information Systems, 2022
The challenges of this research in comparison with traditional methods are as follows: Technical challenge: the main challenge is to integrate different system platforms, including SAP, Extricity, and Biztalk. Different programming languages are used for different system platforms, for example, ABAP programming language for SAP and Java for the Extricity platform. Other system platforms must also be integrated via different system interfaces, such as SAP IDOC, BAPI, and RFC interfaces.Management challenge: this research not only proposes the implementation of a new system, it also aims to plan and conduct new business operating procedures, for example, the shipping barcode label has been changed for the operation of the new system.Business challenge: the main business challenge constitutes the communication with each hub to accept the new procedures for transactions.