Explore chapters and articles related to this topic
Minimizing Total Place Capacity under Throughput Constraint for a Weighted Timed Event Graph
Published in Javier Campos, Carla Seatzu, Xiaolan Xie, in Manufacturing, 2018
Proof: Using the Euclidean division of m0(p) by gcdi,j, we get m0(p)=m0⋆(p)+Rgcd(m0(p)),
Two Decades of Multidimensional Systems Research and Future Trends
Published in Krzysztof Gałkowski, Jeff David Wood, Multidimensional Signals, Circuits and Systems, 2001
Ihe possibility of perfect reconstruction even when the coefficients and the results of multiplications in the various stages of design of ladder structures are quantized was first discusscd in (Bruckcrs & van den Emden 1992). Generic networks for the two-band and three-band cases for pcrfcct inversion and reconstruction were given in an ad hoc manner in (Bruekers & van den Emden 1992). In (Tolhuizen et al. 1995). the possibility of applying Euclidean division algorithm for polynomials with coefficients in a ground field to systematically generate and realize each generic ladder structure in the two-band case was demonstrated. The multidimensional case was considered but complete results were not
Effects of Cell Phone Usage on Human Health and Specifically on the Brain
Published in Rashmi Agrawal, Jyotir Moy Chatterjee, Abhishek Kumar, Pramod Singh Rathore, Dac-Nhuong Le, Machine Learning for Healthcare, 2020
Soobia Saeed, Afnizanfaizal Abdullah, N. Z. Jhanjhi, Mehmood Naqvi, Shakeel Ahmed
The K-Means aggregation algorithm was created in 1976 by MacQueen. It is an unsupervised collection that performs a certain number of separate groups and (non-dynamic) levels. The strategy is based on a clear and basic way to handle the request of a specific dataset through a specific number of groups (k-mean) previously created. K-mean estimates identify objects without k-objects, going to the initial meeting center. The accompanying step is to take each point that has a place within a specific set of data and move it to the closest center in perspective, near the article to the meeting center, using Euclidean division. After passing each item, it is necessary to recalculate the positions of the new group. The strategy is repeated until there is no match in the beam centers’ k. This estimate reduces an objective limit known as the permissible limit for the square screw that was determined by the transition (Soobia et al. 2019). J(v)=∑ic∑j=0ci(‖xi−vj‖)
An EWMA-type sign chart with exact run length properties
Published in Journal of Quality Technology, 2019
P. Castagliola, K. P. Tran, G. Celano, A. C. Rakitzis, P. E. Maravelakis
For the CEWMA SN control chart, the CEWMA sequence of plotting statistics is obtained through the following formula: where are two positive integer-valued parameters to be fixed, , Yt is the quotient of the Euclidean division where denotes the rounded toward zero integer (i.e., and , for instance) and is the remainder of this Euclidean division, that is,